Essar Power Thermal Plant Soil Removal & Site Levelling
Executed massive 16,00,000 cu. m (16 Lakh Cu.M) soil removal, cut-and-fill, and precision site levelling for the Essar Power plant development.
16,00,000 Cu.M
Soil Moved
Essar Power
Client

Massive land development, site grading, soil compaction, and foundation preparation for Maruti Suzuki India Limited manufacturing campus.
Site grading, cut-and-fill, subgrade stabilization, and heavy machinery pad formation.

SITE EXECUTION RECORD #1
Maruti Suzuki India Ltd.
End Client
Rohan Builders
Main Contractor
Plant Site Land Development
Work
Interested in a similar project?
Contact MIP to discuss your requirements and mobilization timelines.
Send Enquiry
Executed massive 16,00,000 cu. m (16 Lakh Cu.M) soil removal, cut-and-fill, and precision site levelling for the Essar Power plant development.
16,00,000 Cu.M
Soil Moved
Essar Power
Client

Executed 12,00,000 cu. m (12 Lakh Cu.M) of soil excavation and soil transport up to 2 km for industrial land levelling at the Hindalco Aluminium Smelter project.
12,00,000 Cu.M
Excavation
Up to 2 km
Haul Distance

Removed 7,00,000 cu. m (7 Lakh Cu.M) of hard-rock overburden within 7 months, utilizing controlled blasting and extracting 60,000 MT of ore at Hindustan Zinc Matoon Mines.
7,00,000 Cu.M in 7 Mos
Overburden Removed
60,000 MT
Ore Mined