Essar Power Thermal Plant Soil Removal & Site Levelling
Executed massive 16,00,000 cu. m (16 Lakh Cu.M) soil removal, cut-and-fill, and precision site levelling for the Essar Power plant development.
16,00,000 Cu.M
Soil Moved
Essar Power
Client

Executed 18,000 cu. m rock cutting/blasting and 25,000 cu. m soil excavation along with civil works for solid waste management under NBCC government enterprise.
18,000 cu. m rock blasting, 25,000 cu. m soil excavation, and engineered landfill cell preparation.

SITE EXECUTION RECORD #1
18,000 Cu.M
Rock Blasted
25,000 Cu.M
Soil Excavated
NBCC Enterprise
Client
Interested in a similar project?
Contact MIP to discuss your requirements and mobilization timelines.
Send Enquiry
Executed massive 16,00,000 cu. m (16 Lakh Cu.M) soil removal, cut-and-fill, and precision site levelling for the Essar Power plant development.
16,00,000 Cu.M
Soil Moved
Essar Power
Client

Executed 12,00,000 cu. m (12 Lakh Cu.M) of soil excavation and soil transport up to 2 km for industrial land levelling at the Hindalco Aluminium Smelter project.
12,00,000 Cu.M
Excavation
Up to 2 km
Haul Distance

Removed 7,00,000 cu. m (7 Lakh Cu.M) of hard-rock overburden within 7 months, utilizing controlled blasting and extracting 60,000 MT of ore at Hindustan Zinc Matoon Mines.
7,00,000 Cu.M in 7 Mos
Overburden Removed
60,000 MT
Ore Mined